14th February, 2008

The final finishing of the premises takes quite some time to complete. The toilets are ready and finished, but the connection to the waste drains must first be constructed before they can be used. Large rocks still have to be cut away along the route of the pipework.

The metal screenwork for the staircase is being mounted, withdrawn and adjusted for a good fit.

Painters paint the windows of the first floor. And at the rear of the site the block walls are being finished off. All these little jobs take a long time!