
New building materials are delivered |
21st November, 2007 |
A truck laden with construction materials has made it up the slope to the entrance of the school yard. This is no mean feat as the access road is quite narrow and the drive quite steep. The last of the formwork spanning the upper windows is being put in place so that concrete for lintels can be poured. Meanwhile, in other places the workmen are already removing some of the timber formwork from the hand-made lintels, so allowing the walls of the first floor to be further extended. |
|
|
![]() |
|
|
|
|
|
![]() |
|
|