13th November, 2007

On some days it has rained violently and, as a result, the construction work has been interrupted.

Meanwhile all the door frames and window frames have been bricked into position. Even the form work for casting the support beams (lintels) above the windows has been put in place. Hopefully the concrete will be cast soon.